Sunday, 25 of June of 2017

1st sea trial for Mari Cha III after the refit in Palma extending the rig. Her new square top main and mizzen are built in Doyle Stratis Carbon ICE with ULx taffetas. Her striking downwind wardrobe of 1473m2 keeps her nicely powered through the water. #poweredbydoyle

Mari Cha III – 1st post refit sea trial, Palma.

1st sea trial for Mari Cha III after the refit in Palma extending the rig. Her new square top main and mizzen are built in Doyle Stratis Carbon ICE with ULx taffetas. Her striking downwind wardrobe of 1473m2 keeps her nicely powered through the water. #poweredbydoyle

Posted by Doyle Sails Palma on Wednesday, June 14, 2017


The Bermuda sloop “Spirit of Bermuda” can be seen on the Great Sound during this weekends’ America’s Cup coverage in Bermuda. She is pictured here in an earlier Caribbean regatta with all her Doyle sails set.

The Spirit of Bermuda. Photo (c) Richard Sherman.

Posted by Doyle Sailmakers on Friday, June 16, 2017


The stunning sight of 7 J Class yachts racing for the first time EVER – from onboard the eldest member of the fleet, Shamrock V What a day!

The stunning sight of 7 J Class yachts racing for the first time EVER – from onboard the eldest member of the fleet, Shamrock VWhat a day!

Posted by Yachting World on Monday, June 19, 2017


Clewpatch

This is the process of installing a patch on a spinnaker. The sail is pinned flat to the floor and each panel of the patch is seam stuck to the sail individually, so the sewing process becomes easy. Dacron reinforcement is add after and the tapes are last to be applied.